Use of carburizer

Jan 11, 2024 Leave a message

1. Divide into 3 to 5 batches and add with scrap steel, the absorption rate can reach 90-95% (if added at one time, part of it will volatilize as the temperature of the electric furnace increases, and the absorption rate is low);

Note: Do not add scrap steel at the beginning, generally add pig iron first. The melting point of pig iron is lower than that of scrap steel, and pig iron melts faster. After the pig iron turns into molten iron, add scrap steel (the melting point of scrap steel is high, so it melts quickly in the molten iron.) Then Then add carburizer together with the scrap steel.

2. The timing of adding is: when the molten iron is below the induction coil, the carburizer added at this time will be rolled into the molten iron under the action of the magnetic field of the induction coil (if it is added above the induction coil, it will float on the molten iron. Not easy to melt.)

3. Absorption at different temperatures: molten iron absorbs best at 1400°C, ductile iron absorbs best at 1450°C, and molten steel absorbs best at 1500°C;

4. Direct contact with the furnace bottom lining material should be avoided to prevent the carburizing agent from corroding the furnace lining.

5. Try to avoid adding it together with iron filings to prevent the carburizer from clumping with other materials and affecting the absorption of the carburizer.
 
 
 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry