Silica fume engineering summer construction quality control
Aug 01, 2024
Leave a message
1. When the mortar used by the moisturizing tube cannot be poured when using the cement silica fume to pump the pump truck, it cannot be poured to any operating surface. After the mortar mortar is raised, one to two pumping strokes can be poured behind the discharge.
2. There are special persons (understanding professional and responsible technical personnel) in the frontcourt at the time of pouring the car. Verification work is divided into slump testing and work performance testing. In accordance with relevant national regulations, the compressive strength test parts of the silica fume should be performed. Standard maintenance should be performed (the real intensity of silica fume must have the temperature and humidity when the density of the 1 test mode 2 test parts 3 test parts).
During the entire pouring process, professionals must be signed and accepted by the silica fume per car. If you find unqualified silica fume, you should notify the technical department of the mixing station or return in time. The work surface (the person in charge of the frontcourt should strengthen this management). Only the silica fume that meets the relevant national regulations or meets the construction requirements can sign and pour it to the construction work surface. The slump control of silica fume during construction. Different collapses should be selected according to different construction sites during construction. If you find that the collapse is found to be small, you should adjust according to the national standard (not adjusting the water without authorization), and stir until it is evenly poured. And immediately told the mixing station dispatch room, the scheduling room will adjust according to the actual situation. If you find that the collapse is too large, the pouring should be suspended immediately, the reason should be found, whether it affects the quality, and tells the leader or technology department of the mixing station to deal with it.
3. Concrete test block production
The test block is done, which can reduce the unnecessary trouble for construction. When making a test block for concrete, sampling should be taken in the middle of the mixer car. Use a labor vehicle or a iron plate to pick up the materials at one time. After mixing with iron pupa, shovel into the test mode. Do not use iron pupa to put a pupae, so that the material is uneven, it is prone to fluctuating the strength value of the test block, and the mutation coefficient is large but no representative. The mold is divided into two layers. Each layer uses φ16 round -headed reinforced bars to plug in dense, and each layer must be plugged in. Then use a powder knife (iron plate) to insert each test mode around, and discharge the test mode out of the bubbles; put more concrete when entering the mold, 2-3 cm higher than the test mode, and use a powder knife (iron plate) to direction. Press the pressure. After the end, the concrete should be about 1 cm higher than the test model. After the end of the concrete is over, the wipe is flattened, and the mold is dismantled after 24 hours of the shade (before the mold is demolished and after the mold is demolished Vibration and stress); the test block should be marked with the strength level, production time and other contents after the demolition, and then sent it to the standard maintenance room for standard maintenance. In the process, be careful not to vibrate and bear pressure. Be cautious during the production of the entire test parts, and do not bring some unnecessary trouble because of the horse tiger.
4. The fabric must be uniform during the pouring process. In particular, you must choose a few more fabric points when the pouring cylinder or a long wall and a large volume, so as to maintain the uniformity of silica fume. Do not pay attention to methods for convenient construction, do not pay attention to engineering quality.
5. If there are multiple intensity levels in the pouring, the high -strength levels should be poured first and then pouring low -intensity level concrete, and the seams should be set in low -intensity level components. After pouring, the vibration should be performed in time. During the pouring process, the uniformity and denseness of the fabric should be controlled. During the fabric process, pay attention to the fabric situation of the concrete. You should choose a uniform cloth so that the concrete is poured evenly when the work surface is evenly distributed to avoid excessive slurry of some parts. The density will not reach the standard. Some also cracks due to excessive local slurry.
6. The floor or road after pouring should be tied, crushed, and collected in time. Because the expected speed of the product should be arranged on the construction personnel, there must be sufficient manpower to find flat or glowing, and the road or floor is flattened and raised. , Putting. When flattening, the plane will still have uneven surfaces when raising the plane. The water or pulp generated by the concrete will flow to the low place, and the higher parts will lose water because of the premature surface. Currics or false condensation, the surface of the surface is about 2 cm, but the concrete below has not yet condensed. At the same time, it is accompanied by cracks. The lower parts are prolonged due to the slow losses, causing cracks to cause inconsistent condensation and contraction.
At least one crushing and secondary wipes must be performed after the secondary look, especially the summer sun is violent, the temperature is high, and the wind speed is sometimes too large. Moisture and cracks. A light of the light (slightly loading on the surface of the concrete with your fingers with your fingers) is the key. At this time, it is a time when the crack is high. For the cracks that have occurred, it can be slightly sprinkled with a little water, crossing or crushing, or gently patted with iron plates and wooden wipes to make it close after the cracks are fitted. If the crack is not processed in time, it will be severely penetrated through the cracks. When the sun is violent, the temperature is too high, or the wind speed is too high, the concrete must be covered in time. Silica fume will cause cracks to prevent excessive water and excessive evaporation.